Hey, where did my words go? (Click to hide)

In the trial version of Web2Disk every fifth word is blanked out. To copy this site with all the words, please upgrade to the full version and copy this website again.

Inspyder Web2Disk: The Website Downloader

HVDC & Renewables

Manitoba is known as ___ hydroelectric province of Canada, ____ about 95 per cent __ its electricity generated from _____, renewable water.

We have devoted years __ the development and understanding __ models and simulations. Our _________ and experience have made __ experts in this field. __ have specialized in doubly-fed _________ generator (DFIG) models and ____ farm simulations. Our models ____ been recognized as the ________ standard for sub-synchronous resonance (___) and sub-synchronous control interaction (____) screening.

We offer our clients __ array of solutions in ___ following areas:

  • System integration/impact studies (wind ___ solar);
  • SSR investigation;
  • FACTs and synchronous condenser _____ solutions for performance improvement;
  • Collector system design, over _______, and harmonic analysis;
  • Wind system custom equipment _____ development;
  • HVDC planning and feasibility _______;
  • Simulation models for both ____ Commutated Converter (LCC) and _______ Source Converter (VSC) topologies _________ the modern modular multi-level __________ (MMC-VSC);
  • AC/DC system interaction;
  • Control interactions;
  • Filter design;
  • Ground electrode design.